2 years ago
# TTYnvtxFk9x6d4myFOUNDATION LOGISTICAL LOG
--FOUNDATION ENGINEERING CONSTRUCTION LOG--
Name: Scott Wozzer
Date of Construction: 12/16/22 20:30
Personnel Involved: GSU Erickson, SSO Price, Sergeant Cloaker, Agent Aurelian, Janitor Cleaner
Tools Required: Plumbing tools, wrenches, clamps, power tools
Materials Required: Pipes provided by laundry machines. Pipes removed from the ground were returned to machines, toilets, a lot of water, and a D-Block Plumbing map
Description of Construction: Due to a UA, the regular D-Block bathroom is unusable and it is ineffectual to attempt to enter at this point. in response, I decided to make a new lavatory. After having IS Agent permit the construction and janitor Cleaner handling water systems, I was able to remove pipes to use for irrigating the water flow to the new toilets. I replaced some pipes near the storage room in order to both fill the toilet tank as well as being separated from both the drinking water and the original bathroom due to the UA. Upon finalizing the pipe structure in both the new lavatory and the laundry room, I had Cleaner restart the water, which worked. The toilets were able to properly fill and drain without flood. I conducted tests using small disposable objects (including a D-Class's excrements) to see if they would damage anything. It did not. Drinking water was checked, no sign of E. Coli. The structure was completed with a sign and walls to engage privacy and the structure was completed. If any discrepancies email me at [email protected]
Future Construction Required? (Optional) : Deconstruction of temp-lavatory once UA is wiped, potential rework of Laundry Room and regular lavatory depending on D-Class treatment of new lavatory
Additional Notes: D-Class knows the consequences of the bathroom, anyone reading this has my permission to persuade D-Block by utilizing this information.
FMO Krieg Ludacris - Alive
STR C.Q.S "Joker" - Alive
Logistics LT Scott Wozzer - Alive