2 years ago
# JrubtLPc8_9PlGB4<LEVEL [3] CLEARANCE REQUIRED>
<VALIDATING CLEARANCE...>
<CLEARANCE VALIDATED>
Foundation Logistics
Engineering
--Construction Log--
____________________________________________________________________________________________
Name: Head Engineer "Rurik" Rurikovich
Date of Construction : 1/3/23
Description of Construction:
A bridge connecting the Entrance Zone and the Light Containment Zone
Personnel Involved:
<Various Engineers>
___________________________________________________________________________________________
Required Tools: Several heavy duty drills, pickaxes, temporary supports, etc.
Required Materials: 5 Steel panels, 2 concrete walls , 10 smaller metal supports, 2 Standard Foundation door frames, 2 Standard Foundation doors, 4 standard foundation buttons (and the wiring required for such).
Additional Notes:
// RP Mod: N/A
___________________________________________________________________________________________
Kyrie Elieson!
Head Engineer Rurik
SSO Hadrian
SID Recruit Vladik
New Admin