2 years ago
# Lwo42dCID4culfH3<LEVEL 3 CLEARANCE REQUIRED>
<VALIDATING CLEARANCE...>
<CLEARANCE VALIDATED>
Foundation Logistics
Engineering
--General Repair Log–
____________________________________________________________________________________________
Name: Logistics LT Scott Wozzer
Date of Repair: 1/8/23
Personnel Involved: N/A as most personnel were working on RC’ing 096
Description of the Issue: Micro-HID disrupted 096 CC, dysfunctional pressure plates and
____________________________________________________________________________________________
Tools Required: Electrical Kit, Power Tools, Allen Wrenches, Welder
Materials Required: Metal plates, Gears, Copper Wiring
Description of Repair: Beginning with the wall, a simple rebuild of the wall utilizing metal plates welded into prior wall. Pressure plates were fixed by the removal of base plates, replacement of electrical work, and reallocation of any busted gears or servos. Base plates were then put back on. Test with a containment cubed proved new pressure plates operational, as well as a quick test of launching it into a wall utilizing a simple air cannon.
Future Repair Required? (Optional) : Future routine inspections may be required based on outlook of integrity
Additional Notes: I would suggest that we relocate SCPs for future Micro-HID tests, as damaging CCs further could prove them unoperational.
FMO Krieg Ludacris - Alive
STR C.Q.S "Joker" - Alive
Logistics LT Scott Wozzer - Alive