2 years ago - edited
# 6H-6C4BOXUItr21kFOUNDATION LOGISTICAL LOG
--FOUNDATION ENGINEERING SCP CC INSPECTION LOG--
Name:
Date of Inspection:
Personnel Involved:
SCP CC Inspected:
Tools Required:
Materials Required:
Description of Damage (if applicable):
Future Repair/Followup inspection Required? (Optional) :
Additional Notes:
Kyrie Elieson!
Head Engineer Rurik
SSO Hadrian
SID Recruit Vladik
New Admin